SPARK IGNITION OPERATION SEQUENCE:
A call for heat occurs from the building’s environment
control.
1-15 VDC is sent from the SmartBox
variable rate heat
controller to the variable rate solenoid on gas control
valve.
Line voltage is sent to transformer and to ignition control
24 V.A.C. is sent from transformer to the ignition control.
A call for heat occurs
Red light on ignition control is illuminated
Ignition control module performs an internal safe start
check
-- Internal components are tested
-- Amperage is sent to flame sensor from ignition
control to start flame proving process.
-- Ignition control terminal PS1 sends 24 volts to air
proving switch.
Ignition control module begins safety lockout timing
Ignition control module sends 115 volts from terminal
IND to the fan motor.
-- fan motor starts
-- Air proving switch closes and 24 volts is returned
to ignition control terminal PS2.
Ignition control powers the igniter and igniter sparks.
Ignition control sends 24 volts from terminal MV to gas
control through high limit switch.
Ignition occurs
-- Igniter continues to spark until flame proving
occurs.
-- Igniter spark is discontinued
-- Gas valve stays open
Room warms to desired temperature
-- Room sensor is satisfied
-- Heater shuts down
Process begins again on call for heat
MULTIPLE IGNITION TRIAL SEQUENCE
First trial for ignition takes approximately 10 seconds
Two more trials for ignition willoccur
-- Second and third trial follow immediately if first
trial fails
Module starts a 15 minute wait period to allow
ignition interruption to pass
Ignition control repeats 3 ignition attempts after 15
minute wait period
If ignition control module does not prove flame after third
trial, the module goes into safety lockout (3 flash pattern)
-- Igniter shuts down
-- Fan motor svtops
-- Gas valve closes
Ignition control must be reset
-- Unplug the heater and plug it back in
-- OR --
-- Turn building controller off and then back on to call
for heat