Instructions

NetTEST II Menu Guide
© KUNBUS 7
5 NetTEST II Menu Guide
5.1 Start-Up / Setting in Operation
Check the completeness of the scope of delivery and charge
batteries before initial operation. Remove the battery by gently
pressing the locking and at the same time pulling down the
battery placed at the rear lower side of the NetTEST II. Now
place the battery into the charging holder, and check the
loading procedure by means of the LED in the battery charger.
For detailed information refer to the enclosed documentation of
the battery charger. Remove the battery from the charging
holder and push it onto the NetTEST II until you can hear it
snapped in.
Now push the key approximately 1 s, until the PROFIBUS
logo appears on the screen. Then release the key. Besides
the PROFIBUS logo, the firmware version and date appears for
approximately 2 s.
Figure 2: Screen ‘Start-up’
Now the main menu is displayed automatically. The test tool is
ready for operation. With various different text outputs the
display is too small. This will be indicated by "^^" at the right
upper and "vv" at the right lower corner of the text. By pressing
the keys you may scroll up or down in the text.










