User Guide
Table Of Contents
- 1. QUICK START GUIDE
- 1.1 Package Content
- 1.2 Required Tools and Equipment
- 1.3 Parts of a Kunak AIR Pro Station
- 1.4 Power On/Off Button
- 1.5 LEDs Indicators and Display Buttons
- 1.6 Installation of the Smart Gas Cartridge
- 1.7 Pluggable Probes or Extra Sensors
- 1.8 Checking Before Deployment
- 1.9 Location Selection
- 1.10 Installation to Mast or Wall Mount
- 1.11 Storage and Transportation
- 1.12 Kunak Cloud Account
- 1.13 Verification of the Correct Functioning
- 1.14 Getting help
Kunak AIR Pro – QUICK START GUIDE v.6
P. E. La Muga 9, 4º Ofic. 1, Orcoyen, 31160, Navarra, Spain +34 848 470 055 info@kunak.es www.kunak.es/en 8
1
Place the base of the support on a wall or mast.
2
Place the support to the base with the two bolts.
3
Place the device inside the support through the groove.
4
Screw the two captive fixing bolts.
5
Connect the power connector and the probes. Screw the probes
connectors all the way in.
➢ The device must be switched off during connections.
6
Power ON the device returning from “stand-by” by pressing the
sleep button or by pressing down the power ON button.
Table 1 – Installation steps
Note: Once the device is working normally, the status of all sensors, battery, charge and connection can be
checked by pushing the button.