User Guide
Table Of Contents
- 1. QUICK START GUIDE
- 1.1 Package Content
- 1.2 Required Tools and Equipment
- 1.3 Parts of a Kunak AIR Pro Station
- 1.4 Power On/Off Button
- 1.5 LEDs Indicators and Display Buttons
- 1.6 Installation of the Smart Gas Cartridge
- 1.7 Pluggable Probes or Extra Sensors
- 1.8 Checking Before Deployment
- 1.9 Location Selection
- 1.10 Installation to Mast or Wall Mount
- 1.11 Storage and Transportation
- 1.12 Kunak Cloud Account
- 1.13 Verification of the Correct Functioning
- 1.14 Getting help
Kunak AIR Pro – QUICK START GUIDE v.6
P. E. La Muga 9, 4º Ofic. 1, Orcoyen, 31160, Navarra, Spain +34 848 470 055 info@kunak.es www.kunak.es/en 6
1
Remove the metallic grid cartridge protector by
loosening the bolts and sliding the protector forward.
2
Plug the cartridges of your choice into the device.
➢ Be careful when inserting the cartridges into the
device, the pins can bend if the cartridge is not
inserted perpendicularly.
➢ The device must be switched off during
connections.
3
Plug all the probes that will be installed at the final
deployment by removing the cover of the connector in
which the probe will be mounted. Do not remove
covers from connectors that are not going to be used.
4
Keep the cartridge covers and the connectors
protectors of the probes in the cartridges box for future
use.
5
Press the power ON button (the button must be held
down) and check on the display that the device detects
all the cartridges (on its position) and probes.
If any sensor is not detected, verify that it is properly
connected.
6
Mount the metallic grid cartridge protector and tighten
the two bolts.
Put the device at stand-by or power OFF depending of
your needs.
1.9 Location Selection
Selecting a location depends on the final application, road traffic monitoring, urban background, etc.
However, the user should have the following considerations when selecting the final location: