Phau Ntawv Qhia

20 Installation sound generator
1 1
2
3
4
Figure 14: Installation sound generator
Table 12: Installation sound generator - instructions
Nr. Work step Note
1 Loosen the marked screw of the tank ller neck. Insert now the sound generator
with the mounting plate at the bottom in the holding triangle and attach the sound
generator at the top with the just loosened screw.
1x10er
socket
2 Pull the connecting cable behind the heat protec ti on plate up to the sound generator.
3 Connect the connecting cable to the sound generator.
4 At tach the delivered steel wire rope to the sound generator and a suitable position
at the vehicle.
Kufatec GmbH & Co. KG - Dahlienstr. 15 - 23795 Bad Segeberg - e-mail: info@kufatec.de 19