Installation Guide
3
www.krugg.us
• Inspect the product immediately upon
receipt for transit damage or missing
parts.
• Handle the product with care and
protect against knocks to all sides and
edges of the glass.
• Make sure that you have all the tools
you need to complete the job
(SEE BELOW)
• Ensure there are no hidden pipes or
cables in the wall before drilling.
TOOLS USED
• Clean using a so dry cloth only when
turned o.
•
materials.
• Do not allow moisture to come into
contact with lamps.
• If drilling holes in ceramic les use a
piece of masking tape on the le to stop
the drill bit from slipping.
IMPORTANT—BEFORE YOU BEGIN