Installation Guide

3
www.krugg.us
Inspect the product immediately upon
receipt for transit damage or missing
parts.
Handle the product with care and
protect against knocks to all sides and
edges of the glass.
Make sure that you have all the tools
you need to complete the job
(SEE BELOW)
Ensure there are no hidden pipes or
cables in the wall before drilling.
TOOLS USED

Clean using a so dry cloth only when
turned o.

materials.
Do not allow moisture to come into
contact with lamps.
If drilling holes in ceramic les use a
piece of masking tape on the le to stop
the drill bit from slipping.
IMPORTANT—BEFORE YOU BEGIN