Datasheet
LSA-PLUS
®
Series 2 & avaNTi Modules and Accessories
1. Fix the back mount frame in a vertical position on the MDF/
Exchange Room and ensure a safe earth connection is established,
through the Bus Bar.
2. Introduce cable and strip
the sheath (free conductor length should equal
distance of furthest
module+200MM).
Then secure cable to the MDF Frame.
3. Form wires into 10-pair groups for each allocated
position, by bringing inside the frame, through the
cable entry holes.
4. Termination of wires.
a. Choose the bottom most slots on MDF to fit
module.
b. Hold the module about 50 mm - 80 mm from
allocated position on the back mount frame.
c. Push wire bundle at lease 150 mm through the module guide loop in the direction
of the permanent side and retain by bending wires over.
d. Place module in allocated position (surplus wire in a loop).
e. Pull wires between the guide notches and lay it into the contact slots.
f. Terminate wires with the 'KRONE' Insertion Tool. Discard surplus wire.
g. Repeat procedure by fixing modules from bottom to top.
5. Jumpering
a. Press jumper wires into the bottom row of
contact slot (jumper side) and connect using
the 'KRONE' Insertion Tool; (Pair 1-5 to the
left side, pair 6-10 to the right side).
b. Lead jumper wires through jumper guide/
ring on either side of the module as
required.
6. Wire can be removed using hook housed at
the side of the 'KRONE' Insertion Tool.
7. To remove the module from backmount frame use the
swing-out module extractor on the 'KRONE' Insertion tool.
Press tags on backmount frame inwards at both
ends and pull module forwards.
Installation for LSA-PLUS
®
S2 Modules