assembly Instructions

67
Step 10
Have the 1 m vertical frames handed
up to you and hang them over the tube
couplings of the 2 m vertical frames
(see picture).
Step 11
Carefully climb up onto the platform.
Please keep in mind that the rail bra-
ces have not yet been installed. Mount
the 1 m vertical frames and secure all
connections with gravity pins.