Specification Sheet

Prior to Installation
Make sure that the cold and hot water lines are turned o
Wrap all threaded connections with Teon tape. Always wrap in a clockwise
direction
Cover your drain to avoid losing parts
Do not disassemble the main faucet body, as it has been installed &
commissioned correctly & precisely before delivery from the factory
To keep the faucet from jamming, ush the water pipe before installation
Using condition: Working pressure at 0.05-1.0MPa (including cold & hot
water pressure) with applicable water temperature: 4C-90C