Manual
52
High pres-
sure
connection
Heating chamber
Water inlet
Detergent
1 Float valve, water inlet
2 Water tank
3 Control valve, detergent
4 High pressure pump
with integrated unloader valve
5 Pressure switch Motor Start/Stop
Pipeline plan
6 Pressure switch Burner release
7 Safety valve for heating coile
8 Flow controller
9 Fuel pump with solenoid valve
10 Fuel î‚¿lter
11 Fuel tank
Safety valve, number
5 must be set approx.
15 % higher than the
unloader valve on the
HP pump