User's Manual

2. Insert the mushroom through the cover hole, first the
cable.
3. Screw the Nut with the metal washer above. Tied the
Nut not too much – just be sure that mushroom is tied
to the pit cover.
4. Place the cover on the pit carefully and verify that
nothing touches it.
5. Remove the pit cover and place it on the upper cover
side so the mushroom i.e. ups down.
6. Connect the cable with the meter cable. Make sure
that the two connector ration before pushing one in
the other.
7. Place the lid back and cover the pit.
3. PDA using
The MT2P is sealed without any visual indication e.g. LED. The unit functionality
should be inspected before leaving the pit site. The MT2P is in a very low energy. To
wake up the unit for testing a magnet should be approach the upper side on the unit
from the outside. The MT2P wakes for shot time waiting from a wireless prompt
from the PDA.
4. PDA setting.