User Manual

21
12. Turn off the main switch after 10 minutes.
13. Remove the drain plug from the water trough, remove the water, reinstall the drain plug.
14. Proceed with the third Sanitizing Procedure in the same manner as that of the second
Sanitizing Procedure (repeat paragraphs 11~13).
15. Proceed with washing process.
16. Open the water supply valve to fill the water trough. Set the main switch to
“WASH” position to execute washing process.
17. After 10 minutes, turn the main switch to OFF position and close the water supply valve.
18. Remove the drain plug from the water trough, remove the water, reinstall the drain plug.
19. When the Sanitizing Procedure and washing processes are complete, open the water
supply valve and set the switch to the “ICE” position. Dispose of the first ice batch and use the
ice from the second batch.