Ice Machine Stacking Kit Instructions P/N 102139801 Stacking Instructions For: GB560 Series GBX560 Series GB1060 Series GBX1060 Series Kold-Draft International, LLC 1525 East Lake Road Erie. PA 16511-1088 U.S.A. 814-453-6761 FAX: 814-455-6336 www.kold-draft.
SAFETY WARNINGS AND INFORMATION CAUTION KNOWLEDGE OF PROPER INSTALLATION AND SERVICE PROCEDURES IS ESSENTIAL TO THE SAFE OPERATION AND MAINTENANCE OF KOLD-DRAFT EQUIPMENT. REFER ALL INSTALLATION AND SERVICE WORK TO QUALIFIED TECHNICIANS. ALWAYS DISCONNECT THE POWER SUPPLY BEFORE SERVICING THE EQUIPMENT OR WHEN THE EQUIPMENT WILL NOT BE USED FOR A PERIOD OF TIME. SOME CIRCUITS REMAIN ENERGIZED WHEN THE ICE MACHINE IS SWITCHED OFF.
STACKING INSTRUCTIONS Remove the cabinet panels from the upper and lower ice machines. Mount the frame spacers on the top side panel flanges of the lower ice machine frame. Position so the spacer holes are aligned with the holes in the frame (see illustration below). For standard GB Series ice machines, position the front panel hanger on the top front rail of the lower ice machine (see illustration below).
For GBX Series ice machines, a front panel hanger is not used. Instead a black panel trim is placed over the top of the lower ice machines front panel, when the front panel is mounted (see illustration below). PANEL TRIM MOUNTING GBX SERIES ONLY GBX SERIES PANEL TRIM GBX SERIES BLACK MOUNTING SCREW FOR FRONT PANEL GBX SERIES FRONT PANEL TOP FRONT RAIL OF LOWER ICE MACHINE Apply the gasket provided to the top of the lower ice machine frame as shown.
Position the stacking chute in the lower machine as shown. Locate on the support channels, against the partition wall. Carefully lift the upper machine and place it on top of the lower machine and align the frames. Fasten the frames together using the screws, washers and lock nuts provided (see illustration below).
Replace the front and back deflectors, provided with the ice machine, with the deflectors provided in the stacking kit. Install the deflectors into the slots in the back wall and front rail. Push down on the deflectors until they engage the stacking chute and snap in place. Feed the bin probe from the upper machine, through one of the holes in the upper machine condensing unit pan and position in one of the holes in the lower ice machine condensing unit pan and adjust as required (illustration below).