Product Manual
TP-6946 3/16 71Section 8 Performance Test Form
Section 8 Performance Test Form
Conduct the performance tests outlined in Sections 5.3
and 5.4, and record the results on the following form.
This form must be retained by those in charge of the
building’s electrical installation in order to be available to
the authority having jurisdiction.
Date Personnel Tests Performed Comments
Interconnection evaluation
Grounding point evaluation
Fault current test:
Ground fault settings --
______________________________
Simulated current --
______________________________
Results --
______________________________