Product Manual
TP-6946 3/1668 Section 7 Changing the Service Disconnect Position
Procedure for ICCB Models
1. At the generator (emergency) circuit breaker inside
the transfer switch, find lead G-22, which is
connected to terminal 22 on the circuit breaker
auxiliary contact terminal block. See Figure 7-8.
Disconnect lead G-22 and reconnect it to
terminal 24.
2. At the utility (normal) circuit breaker, disconnect
leads G-21 and U-21 from the circuit breaker
auxiliary contact terminal block. Crimp leads G-21
and U-21 together.
1
1. Disconnect lead G-22 from generator breaker auxiliary contact terminal 22 and connect to terminal 24. See DETAIL A.
2. Disconnect leads G-21 and U-21 from utility breaker auxiliary contact terminal block and crimp the leads together.
2
GM95679
DETAIL A
TO P3
1
Figure 7-8 Reconnection of Leads G21, G22, and U21, ICCB Models