Installation Guide Continued

3. Reconnect
NOTE: The blower motor must be located within 15’ (4.6 m) of the bath, with no more than six direction
changes in piping.
NOTE: If the blower motor is wired to a junction box (Canada units only), the junction box and blower
must be moved together.
NOTE: The blower motor must be oriented horizontally, and installed to a support block that is the same
height as the original mounted location relative to the bath, or 1-1/2 (38 mm) above the floor.
NOTE: Refer to the Before You Begin section for other detailed requirements for the blower motor
relocation.
At the new blower motor location, install a minimum 1-1/2 (38 mm) high block (not supplied) for
the blower motor support.
Use the blower motor as a template to mark the location of the four mounting bolts or screws.
Drill four pilot holes for the blower motor mounting screws.
Fasten the blower motor to the support board.
Route PVC or other 1-1/2 piping (not supplied) between the bath and the blower motor location.
For blower with check valve: Install the check valve at the blower motor location. The check valve
must be oriented vertically. Confirm the check valve is oriented with the flow arrow pointing away
from the blower motor, and that it is located no lower than 24 (610 mm) below the bath rim.
For blower without check valve: Connect each previously cut end of the PVC with the provided
1-1/2 couplings.
Route the provided cable from the new blower motor location to the bath. Use cable ties or other
support clips (not supplied) to support the cable.
Connect the cable to the blower motor. The cable connector at the blower should be oriented with
the flat side facing up.
Use the provided retaining clip to prevent accidental cable disconnection.
Connect the cable to the user interface.
Ensure that any wall holes are properly sealed as required by local building or fire codes.
Check Valve
Cable
Retainer
Clip
1-1/2
(38 mm)