Installation Guide Continued
Tools and Materials
•
Flat blade screwdriver
•
Drill and bits to install the blower mounting fasteners
•
1-1/2″ PVC or other pipe with fittings, unions, PVC cement (or equivalent fastening method), and
support clips (as required)
•
Four fasteners (such as flathead wood screws or concrete anchors) to mount the blower motor
•
Cable ties/support clips to support the keypad cable
Kohler Co. 3 1037564-2-E