Installation Sheet

Table Of Contents
9. Position the Fixed Panel Wall Jamb
Strike Side
Wall Jamb
3/8"
(10 mm)
Adjustment
Screws
Adjustment
Block
IMPORTANT! The xed panel wall jamb must t tightly against the shower base and wall.
The xed panel wall jamb can be installed with either end to the top. The xed panel wall jamb has two preinstalled
adjustment screws.
If needed, shape and le the boom corner to t against the shower base and wall. Use a coin to match and transfer the
corner radius.
Plumb the xed panel wall jamb.
Tape the xed panel wall jamb in place.
1409304-2-B
14 Kohler Co.