Installation Sheet

Table Of Contents
5. Position the Door
1/16"
(2 mm)
NOTE: Two people should perform this installation.
Slide the seing blocks underneath the glass.
Position the seing blocks 1/16” (2 mm) from the front edge of the shower base.
1409304-2-B
10 Kohler Co.