Installation Guide
4
113425-2-CA (9501)
Kohler Co., Kohler, WI
To Connect Water Supplies: Copper inlet tubes should
be bent carefully to prevent kinking. Attach faucet supply
tube to cold supply pipe, then attach the hot supply.
Supply Tube
Inlet
Tube
Coupling
Nut
Ferrule
Compression
Fitting
Ferrule
Coupling Nut
Fig. #8 
If Shut-off Valves Are Used: Cut supply tube to allow re-
quired penetration into shut-off valve. Slide coupling nut
and ferrule from shut-off valve onto supply. Insert supply
tubes into inlets of shut-off valves. Tighten coupling nuts.
Supply Tube
Coupling Nut
Ferrule
Shut-Off Valve
Fig. #9 
AFTER INSTALLATION
Remove the spray head and screen gasket. Position the
hose in the sink. Turn the hot and cold water supplies on.
Turn the faucet handle to the cold side and lift to the ”ON”
position. Run water through the faucet for about one min-
ute to remove any debris. Without turning the water off,
rotate the faucet to the hot side and flush for one minute.
Reinstall the screen gasket and spray head. Check for
leaks.
Fig. #10 
Screen Gasket
Spray Head
Hose
TROUBLESHOOTING
Check for leakage at all the joints.
Check the handle for smooth operation. Check the finish
for damage.
To replace the valve cartridge, see the instructions
packed with the valve cartridge.




