Instruction Manual

Fig. 1
Fig. 2
Ensure the earth lead on the LED plate is secured correctly to the earth lead on the body of the fitting
Fix the LED tray to the body
Choose the required colour temperature by means of the three-position switch (see Fig. 2)
• Please see DIP switch layout to set up the sensor
• Replace the diffuser ensuring seal is in place
• Switch on and check for correct operation, ensuring the green indicator LED is illuminated
We recommend, on commissioning the installation, a minimum charge period of 24 hours before carrying
out an emergency duration test
Connect the luminaire to the mains supply ensuring the correct polarity is observed (see Fig. 1): L - Live
(brown), E - Earth (green/yellow), N - Neutral (blue). The earth terminal is non-functional and only provided
for convenience