Instruction Manual
Fig. 1
Fig. 2
• Ensure the earth lead on the LED plate is secured correctly to the earth lead on the body of the fitting
• Fix the LED tray to the body
• Choose the required colour temperature by means of the three-position switch (see Fig. 2)
• Please see DIP switch layout to set up the sensor
• Replace the diffuser ensuring seal is in place
• Switch on and check for correct operation, ensuring the green indicator LED is illuminated
• We recommend, on commissioning the installation, a minimum charge period of 24 hours before carrying
out an emergency duration test
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
• Connect the luminaire to the mains supply ensuring the correct polarity is observed (see Fig. 1): L - Live
(brown), E - Earth (green/yellow), N - Neutral (blue). The earth terminal is non-functional and only provided
for convenience