Installation Guide

These instructions should be read carefully and retained after installation by the end user for
future reference and maintenance.
These instructions should be used to aid installation of the following products:
SHE1BEM / SHE1GEM / SHE2BEM / SHE2GEM
GENERAL INSTRUCTIONS
This product must be installed in accordance with the latest edition of the IEE Wiring Regulations (BS7671)
and current Building Regulations. If in any doubt, consult a qualified electrician
Please isolate mains prior to installation or maintenance
Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of the
circuit cable, fuse, or circuit breaker
Please note the IP (Ingress Protection) rating of this product when deciding the location for installation
This product is Class I and must be earthed
This product is IP65 rated
SAFETY
INSTALLATION
Note - If this luminaire is being used in conjunction with an external PIR or sensor, please confirm with the
manufacturer of the sensors that they are compatible with LED luminaires.
Provide power to the required point of installation (refer to BS7671 for correct cabling methods). Suitable IP
rated junction boxes should be used where required
Remove the diffuser by unscrewing the four hex screws at the front of the diffuser
Using the baseplate as a template, mark the location for, and drill the fixing holes ensuring not to infringe with
any gas/water pipes or electrical cables
Feed the mains cable through the rubber grommet to retain IP rating, and secure the baseplate to the surface
Ensuring correct polarity is observed, carefully wire as shown (Fig. 1) for non-maintained operation, maintained
operation (Fig. 2) or switched-maintained operation (Fig. 3)