Instruction Manual

Mark the location of the fixing holes and drill the holes ensuring not to infringe with any
gas/water pipes or electrical cables
Feed the mains cable through the rubber grommet to retain IP rating, and secure the
baseplate to the surface
Connect to the mains supply ensuring the correct polarity is observed: L – Live, SL –
Switched Live (brown), E – Earth (green/yellow), N – Neutral (blue) (see Fig. 3). The earth
terminal is non-functional and only provided for convenience
Fig. 3
Ensure the battery is connected via the plug and socket to the PCB
Refasten the LED plate screw
Reattach the diffuser by rotating clockwise
Switch on and check for correct operation ensuring the green indicator LED is illuminated
We recommend, on commissioning the installation, a minimum charge period of 24
hours before carrying out an emergency duration test