User's Manual
!
Installation Guide
SPES2
IT Converged LED Lighting
KMW INC.
183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea
Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com
!
Installation Instruction!
1
2
Shut off the main power before installing the product.
Make sure that the dimension of the light pole is correct.
(diameter should be Ø60.5 mm or less)
Insert the AC power line and the LAN cable into the light pole.
*Do not connect the WAN cable when installing the slave SPES.
Remove the pole cover using a 2.5mm hex wrench.
Separate the pole clamp by releasing the M10 hexagonal headed bolts.
3
4
Release the latch-fixing bolts and open the base cover.
Remove the caps of the AC power line and the LAN cable glands.
Insert the AC power line and the LAN cable from the bottom.
*Do not connect the WAN cable when installing the slave SPES.