Verify site preparation and physical installation are completed: (see Alcatel-Lucent RRH2x60-B4 – Site
Preparation Guidelines, 3MN-01520-0001-RJZZA):
3. Tools, materials, and prerequisites – Prerequisites
Before installation of the Alcatel-Lucent RRH2x60-B4 site can begin, site preparation must be completed.
The following site preparation general requirements must be met before the installation of the Alcatel-Lucent
RRH2x60-B4 can begin:
● Adequate clearance must be provided for service access
● DC electric service (with a readily accessible disconnect device ) must be installed
● User alarm facilities must be installed ● Grounding electrode system must be installed and tested
● RF and antenna runs must be installed (if required) ● Surge protection for antennas must be installed (if required)
● Tower light power must be installed (if required) ● Tower light alarm must be installed (if required)
● The environment must comply with limits listed under Environmental requirements in the Alcatel-Lucent
RRH2x60-B4 – Site Preparation Guidelines, 3MN-01520-0001-RJZZA
● Cable supports and racks must be installed ● Conduit for DC power must be installed when applicable
Installation
p
rocedure checklist
Done N/A Task
5-1: Install RRH on a pole
5-2: Install RRH on a wall
5-3: Procedure to chan
g
e from T
yp
e A confi
g
uration to T
yp
e B
p
gypg
yp
5-4: Connect protective earth (PE) ground
5-5: Connect optical fiber cables
5-6: Route and connect user alarm cables (optional)
5-7: Route and connect AISG cable
(
o
p
tional
)
Alcatel-Lucent RRH 2x60-B4
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
3MN-01520-0002-RJZZA Issue 0.02 March 2014
Sheet 10 of 24
(p )
5-8: Route and connect RF cables (optional)
5-9: Connect DC power cable
5-10: Final checks prior to installation