Installation Instructions
SHELF & DRAWER LOCATIONS
CAM LOCK DOWEL LOCATIONS
14" depth uprights and shelves will require cam dowels
to be installed in the front column of holes and back
coulmn of holes.
24" depth uprights and shelves will require cam dowels
to be installed in the second column of holes and back
coulmn of holes.
When installing a 14" depth shelf in a 24" depth upright,
the cam dowels will be installed in the third column of
holes and back column of holes.
1
14" Depth 24" Depth
2
CAM LOCK SHELF LOCATIONS
All shelves will be installed in the top row of holes on
the upright. Other configurations will require the 33rd
row from the top and last row (65th) for a center and
bottom shelf.
Any additional shelves can be placed where desired for
optimal storage.
1
2
24" Depth14" Depth
1
33
65
1
33
65
DRAWER LOCATIONS - 4 DRAWER BANK
This configuration is made from Medium Drawer Kits.
Follow step-by-step instructions with your drawer kit.
Refer to this layout for glide installation location.
Note: There is no bottom shelf installed with drawer banks.
39
47
55
63
24" Depth
3
7