Installation Instructions
Table Of Contents
- Table of Contents
- Table des matières
- Range Hood Safety
- installation requirements
- Installation Instructions
- Prepare Location
- Prepare In-Line Smart Kit
- Install In-Line Smart Kit KVWB40DS Series Range Hoods
- Complete Installation
- Make Electrical Connection
- Install In-Line Smart Kit KVUB60DS Series Range Hoods
- Complete Installation
- Make Electrical Connection
- Install In-Line Smart Kit JXW85DS, JXI85DS, KVWB60DS, and KVIB60DS Series Range Hoods
- Complete Installation
- Make Electrical Connection
- Install In-Line Smart Kit WVW75UC and WV175UC Series Range Hoods
- Complete Installation
- Make Electrical Connection
- wiring diagram
- sÉcuritÉ de la hotte de cuisiniÈre
- Exigences d’installation
- Instructions d’installation
- Préparation de l’emplacement
- Préparation du ventilateur déporté intelligent
- Installation du ventilateur déporté intelligent Hottes série KVWB40DS
- Achever l’installation
- Raccordement électrique
- Installation du ventilateur déporté intelligent Hottes série KVUB60DS
- Achever l’installation
- Raccordement électrique
- Installation du ventilateur déporté intelligent Hottes série JXW85DS, JXI85DS, KVWB60DS et KVIB60DS
- Achever l’installation
- Raccordement électrique
- Installation du ventilateur déporté intelligent Hottes série WVW75UC et WV175UC
- Achever l’installation
- Raccordement électrique
- schÉma de cÂblage
22
8. Connect the 9-pin connector from the blower motor to the
9-pin connector inside the in-line base.
9. Slide the in-line housing inside the in-line base. Align the
mounting holes in the in-line housing to the mounting holes in
the in-line base. Secure with the 4 screws removed when the
in-line housing was removed from the in-line base. Use the
T20
®
Torx
®
adapter to secure the screws.
10. Install the vent transition with a backdraft damper to the top
of the in-line housing. Use the T10 Torx
®
adapter and install
2 - 3.5 x 9.5 mm mounting screws to secure the transition to
the housing
.
Install In-Line Smart Kit
The In-Line Smart Kit must be installed to a secure structure of
the roof, ceiling, wall, or floor. The In-Line Smart Kit may also be
installed into a new or existing frame construction.
1. Using two or more people, position the assembled In-Line
Smart Kit (housing, base and mounting bracket) in its final
mounting location.
2. Use a pencil to mark the location of the 4 mounting holes.
3. Drill 4 mounting pilot holes where marked.
4. Install the In-Line Smart assembly in its final location using
4 - 5 x 45 mm screws.
A. In-line housing
B. Vent transition (with backdraft damper)
C. 3.5 x 9.5 mm screws (2)
A
B
C
A. Mounting screws (4)
B. Secure structure (joist, rafters or trusses)
C. In-line smart assembly
WARNING
Excessive Weight Hazard
Use two or more people to move and install
range hood.
Failure to do so can result in back or other injury.
A
B
C