Oven User Manual

m
GAS BUILT-IN
SINGLE & DOUBLE OVENS
MODEL (single).
KGBS 146s
MODEL (double).
KGBS 246s
INSTALLATION
INSTRUCTIONS
INSTALLER: FINAL CHECK LIST
PLACEMENT OF UNIT
0 1. Properly positioned - level, aligned and square with cabinet opening.
0 2. Anchored securely to cabinet.
cl 3.0
ven must not be placed under countertop or microwave oven.
ELECTRICAL
0 1. Oven properly grounded,
0 2. Polarized three-wire 12OVAC. 15.20Ampere receptacle with 15-20ampere overcurrent
protection provided for service cord connection.
GAS SUPPLY
t
0 1. Supply line of 3/8” black iron pipe provided,
0 2. Manual gas shutoff valve must be installed in accessible location. Do Not install shutoff valve
behind oven.
0 3. Oven connections must be tested for gas leaks.
OPERATIONAL
[7 1. If used on LP gas, verify that pressure regulator and orifice hoods have been modified for
use with LP gas.
0 2. Oven racks installed and
slide freely in all posttions.
0 3. Knobs secured in place and rotate freely without rubbing on edge of control panel glass
holes,
0 4. Selector switch functions in all modes.
0 5. All lights function properly.
0 6. Refer to use and care guide to set electronic clock.
0 7. Doors properly adjusted, open and close smoothly.
0 8. Unless instructed to leave for owner, remove all tags, labels and internal packing material.
0 9. Oven has been wiped clean to remove fingerprints and other smudges.
THANK YOU INSTALLER:
1. Complete Installation Check List.
2.
Leave all literature for customer.
3.
Notify dealer that installation is completed.
FOR DETAILED INSTRUCTIONS, FOLLOW METHODS DESCRIBED IN THIS FOLDER.

Summary of content (11 pages)