Use & Care Guide
Table Of Contents
- REFRIGERATOR SAFETY
- Refrigerator Safety
- MODEL
- Models
- MAINTENANCE AND CARE
- Cleaning
- Changing the LED Module
- Refrigeration Shelves and Door Bins
- Sabbath and Vacation Care
- INSTALLATION REQUIREMENTS
- Tools and Parts
- Location Requirements
- Electrical Requirements
- Water Supply Requirements
- Tipping Radius
- Product Dimensions
- Door Swing Dimensions
- Overlay Series Door Panel and Cabinetry Clearance
- Overlay Series Custom Panels and Handle Kits
- Stainless Series Custom Side Panels
- INSTALLATION INSTRUCTIONS
- Unpack the Refrigerator
- Connect the Water Supply
- Plug in Refrigerator
- Move Refrigerator to Final Location
- Level and Align Refrigerator
- Install Overlay Series Custom Panels
- Adjust Doors
- Install Side Panel
- Install Base Grille
- Install Odor Absorber (on some models)
- Complete Installation
- Water System Preparation
- REFRIGERATOR FEATURES
- Water and Ice Dispensers
- Ice Maker and Storage Bin
- Setting Liters and Ounces
- Measured Fill
- Water Filtration System
- Freezer Shelves
- PERFORMANCE DATA SHEET
- Performance Data Sheet
- SÉCURITÉ DU RÉFRIGÉRATEUR
- Sécurité du réfrigérateur
- MODÈLE
- Modèles
- ENTRETIEN ET RÉPARATION
- Nettoyage
- Remplacer le module à DEL
- Tablettes du réfrigérateur et balconnets de porte
- Mode Sabbat et entretien avant les vacances
- EXIGENCES D’INSTALLATION
- Outils et pièces
- Exigences d’emplacement
- Spécifications électriques
- Spécifications de l’alimentation en eau
- Rayon de basculement
- Dimensions du produit
- Dimensions pour l’ouverture des portes
- Dégagement des panneaux de porte de série Overlay et des armoires
- Panneaux personnalisés de série Overlay et ensembles de poignées
- Panneaux latéraux personnalisés Série Stainless
- INSTRUCTIONS D’INSTALLATION
- Déballage du réfrigérateur
- Raccordement à la canalisation d’eau
- Brancher le réfrigérateur
- Déplacement du réfrigérateur à son emplacement définitif
- Réglage de l’aplomb et alignement du réfrigérateur
- Installation des panneaux personnalisés de série Overlay
- Ajustement des portes
- Installation du panneau latéral
- Installation de la grille de la base
- Installer le filtre à odeurs (sur certains modèles)
- Achever l’installation
- Préparation du circuit d’eau
- CARACTÉRISTIQUES DU RÉFRIGÉRATEUR
- Distributeurs d’eau et de glaçons
- Machine à glaçons et bac d’entreposage
- Réglage en litres ou en onces
- Remplissage mesuré
- Système de filtration de l’eau
- Tablettes du congélateur
- FICHE DE DONNÉES DE PERFORMANCE
- Fiche de données de performance
21
Connect to Refrigerator
Parts Supplied
� 1/4" to 1/4" (6.35 mm to 6.35 mm) male-to-male coupling
NOTE: The flexible, codes-approved water supply line should
connect to the supply valve through the floor.
1. Unplug the refrigerator or disconnect power.
2. Connect the 7 ft (2.13 m) flexible codes-approved water tube
to the water supply valve.
3. Flush the main water supply line to remove particles and air in
the water line. Allow enough flow so that water becomes clear.
4. Tape the 7 ft (2.13 m) flexible codes-approved water supply
line to the floor, 7" (17.78 cm) from the left side of the
refrigerator. Tape along the length of the tubing, which will
allow it to pass beneath the refrigerator without interference.
NOTE: Allow a minimum of 26" (66.04 cm) of flexible codes-approved
water supply line to be loose at the front of the refrigerator for
connecting to the refrigerator.
5.
Connect the 7 ft (2.13 m) flexible codes-approved water supply
line to the refrigerator.
NOTE: If the main water shutoff valve is behind the refrigerator, a
secondary water shutoff valve may be installed in line with the water
supply line at the front of the product.
Overmould Coupling (on some models)
A. Household water line
B. Nut (purchased)
C. Ferrule (purchased)
Discrete Coupling (on some models)
A. Household water line
B. Nut (purchased)
C. Ferrule (purchased)
D. Coupling
6.
Turn on the water supply valve and check all connections for
leaks.
E. Bulb
F. Nut
G. Refrigerator water tubing