Ki+chenAid, Automatic Ice Maker Model 3KUIS185V INSTALLATION INSTRUCTIONS a-93
CHANGING TI-IE BIN DOOR The slorage bin door and lower accept an oplional decorative choice. panel are deslgned to wood panel of your The wood panel should be no more than j/4 Inch (6.35 Ihick. GUI il lo the same size as Ihe production panel. See Figure 1. To change the bin door mm) AND LOWER DOOR BIN I Tf 11 %” (28.6 cm) PANEL LOWER PANEL 11’%8” (30.3 cm: PANEL DIMENSIONS panel. 1. Open the bin door. 2. Remove the two screws hold Ihe handle. on lop of the door which 3. Remove 4.
GENERAL INFORMATION . UNPACK 2 3 l BOTTOM FIGURE 1 Lay carlon FIGURE 3 4 Set carton See Figure Lift carton Remove outside rear face and wlrh all break open botlom upnght four flaps outward. 3. all rape and packaglng material and lnslde of the cabinet. See the fan 7 Loosen thumb pan to “thumb LOCATE UNIT Place unit unobstructed, 2 Area should be well ventllaled wth temperature above 150 C, 600 F and below 430 C. 1100 F. Best results are obtained between 210 C. 700 F and 320 C.
FOR THE PLUMBER CONNECT TO WATER (observelocal codes) ELECTRICAL 1 Usa U” (6.35 mm) cold water supply. 2 Prowde a convement water llrw 3 Position the rubmg so it can enter the access hole located in the rmht hand rear of rhe cabinet The tubing should eitend beyond the cabinet fronr when the cabinet IS pushed back unto posft~on See Figure 5. OD soft copper manual tubing shut-oil lor the valve I” the REQUIREMENTS A 220/240 Volt, 50 Hz.
. 1s properly connected to a waler supply and drain IS properly connected lo electruty A 2201240 Volt. 50 Hz.
UNIT WIRING DIAGRAM THINGS TO REMEMBER 0 This model grid circuit Water enters only during the defrost cycle. Therefore the first cycle will be completed without water in the system. 0 As the room and water temperatures the amount of Ice produced This higher operating temperatures wll duced ice producllon 0 The unit touches matically 0 The storage meltage wll lemperaturd. will shut off when ice in the storage bin the bin thermostat well and 41 autocycle to keep the bin full.
CUBELLT -I241 CUTTER CHECK OPERATION GRIDS mm) v 2” mm) A CUBE CUTTER GRID Star! ‘ON Ihe unit by lurmng Ihe service swlch and opening the line waler valve IO v NOTE Lell IS ‘OFF” - Mddle IS “ON” IS ‘CLEAN’ In “CLEAN’ pos~l~on. pump opera1es. I/ Check 1/ water Will not en1er pump pan plate gels told and machInegoes cycle. I/ Check for even water flow over freezIng Unit must be level for proper operallon. v Check for desired cube thickness and after 24 hours adjust if necessary.
Part No. 759099 Prtnted In U.S.A.