User Guide

COPPER PIPE
In-line Installation - 5400 Model
PVC
CEMENT
Corrosion
Resistant Check
Valve
W
a
t
e
r
C
Y
C
L
E
R
M
e
t
e
r
e
d
P
o
o
l
P
u
r
i
f
i
e
r
PVC
CEMENT
1.
2.
3.
4.
14
MATERIALS NEEDED
PVC Cement
#10
X
1 1/4" Phillips Pan
Head Screws with
Washers
RECOMMENDED
Use Phillips pan head
screws through the
mounting holes at the
POOL FROG
®
Cycler
base to secure the
POOL FROG
®
Cycler
into a treated wood
base.
S
e
e
S
e
t
t
i
n
g
C
h
a
r
t
i
n
M
a
n
u
a
l
1
2
3
4
5
6
7
8
P
R
E
C
I
S
E
M
E
T
E
R
I
N
G
F
O
R
M
O
D
E
L
5
4
0
0
Pac
Removal
Maximum
S
e
e
S
e
t
t
i
n
g
C
h
a
r
t
i
n
M
a
n
u
a
l
1
2
3
4
5
6
7
8
P
R
E
C
I
S
E
M
E
T
E
R
I
N
G
F
O
R
M
O
D
E
L
5
4
0
0
Pac
Removal
Maximum
S
e
e
S
e
t
t
i
n
g
C
h
a
r
t
i
n
M
a
n
u
a
l
1
2
3
4
5
6
7
8
P
R
E
C
I
S
E
M
E
T
E
R
I
N
G
F
O
R
M
O
D
E
L
5
4
0
0
Pac
Removal
Maximum
S
e
e
S
e
t
t
i
n
g
C
h
a
r
t
i
n
M
a
n
u
a
l
1
2
3
4
5
6
7
8
P
R
E
C
I
S
E
M
E
T
E
R
I
N
G
F
O
R
M
O
D
E
L
5
4
0
0
Pac
Removal
Maximum
S
e
e
S
e
t
t
i
n
g
C
h
a
r
t
i
n
M
a
n
u
a
l
1
2
3
4
5
6
7
8
P
R
E
C
I
S
E
M
E
T
E
R
I
N
G
F
O
R
M
O
D
E
L
5
4
0
0
Pac
Removal
Maximum
Bi-flow valve
design allows
water flow in
either
direction.
TOOLS NEEDED
Pipe Wrench
Hacksaw
Measure the distance between
POOL FROG
®
Cycler male
adapters and cut out a section
of pipe 3” less than that
dimension.
Insert PVC pipe into male
adapters with a twisting
action. Hold in place 5 to
10 seconds to bond.
If using a POOL FROG
®
Bac Pac, isolating the POOL
FROG
®
Cycler by installing a corrosion resistant check
valve is recommended.
Tape Measure
Following PVC cement directions brush PVC cement on
the inside of the male adapters and to ends of the pipe .
Do NOT install
this POOL
FROG
®
Cycler
off-line.
Do NOT install in copper pipe
if using POOL FROG
®
Bac Pac
as chemical corrosion occurs.
Leave 12" to 15" above
and around POOL
FROG
®
Cycler to allow
room for easy
replacement of POOL
FROG
®
Mineral
Reservoir and POOL
FROG
®
Bac Pac.
12" to 15"
12" to 15"
Install after all equipment and as far as possible from heater.