Installation Guide
FRAME ASSEMBLY
1. Arrange all pipes and ttings on the ground as in Figure #1 below.
2. Starting with the center peak 4-way tting (TOP4WPC) connect all 4 pipe sections (6X6PC & 2X9PC) that
form the center peak into the center peak 4-way tting (TOP4WPC). Figure #2 below.
3. Starting at one corner, attach a 4-way corner tting (4WCPC) and proceed to assemble the perimeter
of the canopy with the 6X6PC, 6X6PC-SW and remaining 4WCPC ttings (see gure #3 below). When
completed, the frame should look like the one in gure #4 below.
4. Place the cover over the frame and temporarily secure at the corners as shown in gure #5.