Instructions / Assembly

LEGS & COVER ASSEMBLY
Inside View Outside View
1. Lift one side of canopy top and insert legs. Proceed to the other side.
2. Pull sides of tarp down and adjust until it ts equally on all sides.
3.
Attach the remaining 4 (60”) pipes to the legs so the sidewalls can be secured. Pipes will t ush against the
bolts as seen below (Figure 1). Using the single clamps on the corners and the double clamps in the middle.
4. Place straps through grommets and around sidewall pipe as seen above (Figure 2). Sidewall pipe should
then be pulled down until the cover is pulled tight. Then the clamps may by tightened.
Insert rst
Insert second
Figure 1
Figure 2
CANOPY REMOVAL:
The best way to remove and fold the
cover would be to follow the exact
opposite of the installation process.
Detach all the ball bungees, unzip the
door, slide up the sides and fold them
over onto the roof. Disassemble your
structure by removing the legs from
one side and lowering it. Then you
could nish folding up your canopy
cover, put it o to the side and nish
taking down the structure.