User's Manual
P/N 81-CO2MAN-001 xix September 2013
LIST OF FIGURES (CONT.)
Figure Name Page Number
3-13 Pressure Trip Applications ..................................................................................... 3-77
3-14 Typical Hand Hose Line System with Rack............................................................... 3-78
3-15 Typical Hand Hose Line System with Reel................................................................ 3-79
4-1 Typical Manifold Layout ........................................................................................ 4-4
4-2 Manifold “Y” Fitting .............................................................................................. 4-5
4-3 Typical Cylinder Strap Location..............................................................................4-6
4-4 Rack Framing - 3 to 6 Cylinders (50 and 75 lb. Capacity), Single Row......................... 4-7
4-5 Rack Framing - 7 to 12 Cylinders (50 and 75 lb. Capacity), Single Row ....................... 4-8
4-6 Cylinder Racks (50 and 75 lb. Capacity), Single Row.................................................4-9
4-7 Rack Framing - 5 to 12 Cylinders (50 and 75 lb. Capacity), Double Row (One Side)...... 4-10
4-8 Rack Framing - 13 to 24 Cylinders (50 and 75 lb. Capacity), Double Row (One Side) .... 4-11
4-9 Cylinder Racks (50 and 75 lb. Capacity), Double Row (One Side) ............................... 4-12
4-10 Rack Framing - 5 to 12 Cylinders (50 and 75 lb. Capacity), Double Row (Two Sides)..... 4-13
4-11 Rack Framing - 13 to 24 Cylinders (50 and 75 lb. Capacity), Double Row (One Side) .... 4-14
4-12 Cylinder Racks (50 and 75 lb. Capacity), Double Row (Two Sides)..............................4-15
4-13 Rack Framing -3 to 5 Cylinders (100 lb. Capacity), Single Row................................... 4-16
4-14 Rack Framing - 6 to 10 Cylinders (100 lb. Capacity), Single Row................................ 4-17
4-15 Rack Framing - 11 to 15 Cylinders (100 lb. Capacity), Single Row .............................. 4-18
4-16 Cylinder Racks (100 lb. Capacity), Single Row ......................................................... 4-19
4-17 Rack Framing - 5 to 10 Cylinders (100 lb. Capacity), Double Row (One Side)...............4-20
4-18 Rack Framing - 11 to 20 Cylinders (100 lb. Capacity), Double Row (One Side) ............. 4-21
4-19 Rack Framing - 21 to 30 Cylinders (100 lb. Capacity), Double Row (One Side) ............. 4-22
4-20 Cylinder Racks (100 lb. Capacity), Double Row (One Side) ........................................ 4-23
4-21 Swivel Adapter to Piping.......................................................................................4-24
4-22 Wiring Diagram for Lockout Valve when Ball Valve is in Fully Open Position ................. 4-26
4-23 Wiring Diagram with Single Solenoid (Main and Reserve) .......................................... 4-30
4-24 Wiring Diagram with Dual Solenoid (Main and Reserve) ............................................ 4-30
4-25 Cable Operated Control Heads............................................................................... 4-31
4-26 Electric Control Heads .......................................................................................... 4-32
4-27 Electric and Cable Operated Control Heads.............................................................. 4-34
4-28 Pneumatic Detector (HAD) .................................................................................... 4-36
4-29 Manometer Pneumatic Detection............................................................................4-37
4-30 Heat Collector ..................................................................................................... 4-39
4-31 Pneumatic Control Head ....................................................................................... 4-41
4-32 Tandem Pneumatic Control Head ...........................................................................4-42
4-33 Typical 1040 and 2300 cu. in. Pilot (Driver) Cylinder Strap Installation (P/N 90-101040-000 and
90-102300-100)4-43
4-34 Pressure Operated Control Heads...........................................................................4-44
4-35 Lever and Pressure Operated Control Heads ............................................................ 4-45
4-36 Pressure-Operated Switches.................................................................................. 4-46
4-37 Pressure Operated Switches, Explosion Proof........................................................... 4-47
4-38 Pressure Operated Trip......................................................................................... 4-47
4-39 Pressure Operated Siren....................................................................................... 4-48
4-40 Odorizer Installation.............................................................................................4-50
4-41 Safety Outlet....................................................................................................... 4-51
4-42 Discharge indicator ..............................................................................................4-51
4-43 Hose Reel Installation...........................................................................................4-52
4-44 Hose Rack Installation.......................................................................................... 4-53
4-45 Hose Assembly.................................................................................................... 4-53
4-46 Horn and Valve Assembly ..................................................................................... 4-54
4-47 Handle and Horn Clips..........................................................................................4-54
6-1 Nitrogen Temperature vs. Pressure Data................................................................. 6-4
6-2 Carbon Dioxide Cylinder Weighing Scale ................................................................. 6-5