CONNECTING POWER & GROUND CABLE TO BATTERY
THIS CONCLUDES THE INSTALLATION PROCESS. REPLACE ALL FACTORY PANELS AND SEATS.
QUESTIONS? PLEASE CONTACT SSV WORKS AT 818-991-1778 OR EMAIL SUPPORT@SSVWORKS.COM
© 2017 SSV Works, Oxnard, CA 93030 GN-3K Rev. B 11-10-17
C
B
D
C
A
D
C. (If you have decided to disconnect the negative terminal as suggested earlier). Reconnect the negative battery cable. Remove the nut and
connect the two ground cables. Reinstall nut and tighten.
D. Unscrew the factory nut on the positive battery terminal. Install the 2 power cables to the screw on the postive battery terminal. Re-install the
factory nut.
B. Zip tie all cables to the factory cabling along the center column away
from the drive shaft.
A. Connect both power cables to both ampliers.