User manual

36 U2300A Series DAQ Service Guide
2 Calibration
Step 2: DAQ configuration and verification test
Step 1:
Power on DAQ device and connect the calibrator to DAQ. Warm up for
30 minutes.
Step 2: DAQ configuration
Send “ROUT:SCAN(@Channel))”, Send “ROUT:CHAN:RANG
Range,(Channel))”, Send “ROUT:CHAN:RANG Range,((@Channel))”,
Send “ACQ:SRAT MaxSamplingRate”
Step 3: Calibrator
Source the desired test voltage to DAQ
Step 4: DAQ data acquisition
Send “ACQ:POIN 100”, Send “DIG”
Step 5: Check waveform complete status
Send “WAV:COMP?
Step 6: DAQ fetch data
Send “WAV:DATA?” Read data as int 16 array
Step 7: Data conversion
Convert the data into voltage and get the average value for 100
points (please see Data conversion section for the formula)
Repeat steps above for all channels, polarities and ranges The
test points are shown as table
Compare the reading with the test specification
Wait: 0.2 second
Step 1:
Power on DAQ device and connect the calibrator to DAQ. Warm up for
30 minutes.
Step 2: DAQ configuration
Send “ROUT:SCAN(@Channel)”, Send “ROUT:CHAN:RANG
Range,(@Channel)”, Send “ROUT:CHAN:POL Polarity,(@Channel)”,
Send “ACQ:SRAT MaxSamplingRate”
Step 3: Calibrator
Source the desired test voltage to DAQ
Yes
No
WAV complete status = YES?