User manual
Introduction 1
Preparing Your Clamp Meter
U1190A Series User’s Guide 3
Preparing Your Clamp Meter
Checking the shipment
When you receive your clamp meter, check the shipment
according to the following procedure.
1 Inspect the shipping container for damage. Signs of
damage may include a dented or torn shipping container
or cushioning material that indicates signs of unusual
stress or compacting. Save the packaging material in case
the clamp meter needs to be returned.
2 Carefully remove the contents from the shipping
container, and verify that the standard accessories and
your ordered options are included in the shipment
according to the standard shipped items list found in the
printed copy of the U1190A Series Quick Start Guide.
3 For any question or problems, refer to the Agilent contact
numbers on the back of this manual.
Installing the batteries
Your clamp meter is powered by two 1.5 V AAA alkaline
batteries (included with the shipment). When you receive
your clamp meter, the AAA alkaline batteries are not
installed.
Use the following procedure to install the batteries.
CAUTION
Before you proceed with the batteries installation, remove all cable
connections to the terminals and ensure that the rotary switch is at the
OFF position. Use only the battery type specified in the “Product
Characteristics” on page 62.
U119XA UG.book Page 3 Thursday, September 15, 2011 4:03 PM










