Instruction Manual

2
Precautions on Regulations and Standards
CE Marking
Keyence Corporation has confirmed that this product complies with the essential requirements of the
applicable EC Directive, based on the following specifications.
Be sure to consider the following specifications when using this product in the Member State of
European Union.
EMC Directive (2004/108/EC)
Applicable standard EN61326-1
Be sure to provide a ground when installing the SJ-F300 Series.
The length of cable (power lead and I/O leads) must be less than or equal to 30 m.
Remarks:
These specifications do not give any guarantee that the end-product with this product incorporated
complies with the essential requirements of EMC Directive. The manufacturer of the end-product is
solely responsible for the compliance on the end-product itself according to EMC Directive.
Low-Voltage Directive (2006/95/EC)
Applicable Standard : EN61010-1
Overvoltage category I
Use this product under pollution degree 2.
Use the power supply for the SJ-F300 Series, that satisfies the requirements of the Limited Power
Source specifications stipulated in EN60950-1 and certified by European third-party certification
organization, or a Keyence Corporation AC adapter (SJ-U2). The specifications of the AC adapter
(SJ-U2) are as follows.
When connecting to an SJ-U2, be sure to use a power cable compliant with European standards.
Applicable standard: EN60950-1
Overvoltage category II
Pollution degree 2
Be sure to provide a ground when installing the SJ-F300 Series.
1ABOUT THE STATIC ELIMINATION BLOWER UNIT SJ-F300 SERIES
1-1 System Configuration
This section describes the system configuration of the Static Elimination Blower Unit SJ-F300 Series.
System Configuration
When used independently
When used in connection
Maximum number of the Static Elimination Blower Units connectable to one Controller Unit is five.
1-2
Checking the Contents of the Package
The package contains the following components and accessories. Before getting started, make sure
that the package contains everything that it is supposed to contain.
Package Contents
When you purchased as a set
When you purchased independently
START
/STOP
BALANCE
ION
FAN
COND
IONLEVEL
SJ-F
300
Series
High-speed, High-precision
Free-layout Static Elimination Blower
Instruction Manual
Before using this Free-layout Elimination Blower,
be sure to thoroughly read this Instruction Manual.
After you are finished with this Instruction Manual,
be sure to store it in a safe place for quick reference.
Attached to the main
unit when shipped
from the factory.
START
/STOP
BALANCE
ION
FAN
COND
IONLEVEL
1-2
Checking the Contents of the Package
Options
* • Total cable length cannot exceed 20 m.
(One unit: 20 m, Two units: 15 m, Three units or more: 10 m)
• To connect the blowers with a cable other than that of 2, 5 and 10 m, use the blower-blower extension
cable (SJ-C * P) in combination with a controller-blower extension cable (SJ-C * J).
Mounting fixture A (OP-78476)
Accessory: M4 screw for fixing
the Static
Elimination Blower
Unit x 4
Mounting fixture B (OP-78477)
Accessory: M4 screw for fixing
the Static
Elimination Blower
Unit x 4
Mounting fixture C (OP-78478)
Accessory: M4 fixing screw x 6
Electrode Unit for exchanging (OP-51407) AC adapter (SJ-U2)
Capable of driving up to one fan.
For details of the AC cable, contact the KEYENCE
sales office in your district.
Controller-Blower extension cable * Blower-Blower extension cable *
SJ-C2J Plug-Jack at both ends 2 m
SJ-C5J Plug-Jack at both ends 5 m
SJ-C10J Plug-Jack at both ends 10 m
SJ-C02P Plug-Plug at both ends 0.2 m
SJ-C2P Plug-Plug at both ends 2 m
SJ-C5P Plug-Plug at both ends 5 m
SJ-C10P Plug-Plug at both ends 10 m