KERN & Sohn GmbH Ziegelei 1 D-72336 Balingen E-Mail: info@kern-sohn.com Tel: +49-[0]7433- 9933-0 Fax: +49-[0]7433-9933-149 Internet: www.kern-sohn.com Operating instructions Second display unit KERN PFB-A08 Version 1.
GB KERN PFB-A08 Version 1.1 01/2013 Operating instructions Second display unit Contents 1 Technical data ................................................................................................ 3 2 Basic Information (General) .......................................................................... 3 2.1 2.2 2.3 Proper use ................................................................................................................. 3 Improper Use ..........................................
1 Technical data Second display unit LCD with a numeral height of 16.5 mm Power is supplied via the connecting cable at the balance. 2 Basic Information (General) 2.1 Proper use The second display unit acquired by you serves as an additional display unit away from the balance to display the weighing value of weighed goods, especially in open points of sale. The second display unit is exclusively suitable for the connection to KERN balances.
3 Basic Safety Precautions 3.1 Pay attention to the instructions in the Operation Manual Carefully read this operation manual before setup and commissioning, even if you are already familiar with KERN appliances. All language versions contain a non-binding translation. The original German is binding. 3.2 Personnel training The appliance may only be operated and maintained by trained personnel. 4 Transport and storage 4.
Unpacking, Setup and Commissioning 5.1 Installation Site, Location of Use The unit is designed to achieve reliable display results under normal conditions of use. Therefore, observe the following for the installation site: Protect the appliance against high humidity, vapours and dust; Do not expose the device to extreme dampness for longer periods of time.
5.4 Connection to the balance Before connecting the second display or unplugging the second display unit to resp. from the balance, make sure that the balance is unplugged from the mains. This second display unit is exclusively suitable for the connection to KERN balances. 5.5 Initial Commissioning In the menu of the connected balance in the menu item “F3 Con“ the parameter “S 232 – P Cont“ has to be set. Set the baud rate at 9600 baud. For details please see operating instructions of the connected balance.
Service, maintenance, disposal 7.1 Cleaning Before cleaning, please disconnect the appliance from the operating voltage. Please do not use aggressive cleaning agents (solvents or similar agents), but a cloth dampened with mild soap suds. Ensure that no liquid penetrates into the device and wipe with a dry soft cloth. 7.2 Service, maintenance The appliance may only be opened by trained service technicians who are authorized by KERN. Before opening, disconnect from power supply. 7.
Instant help In case of an error in the program process, briefly turn off the appliance and disconnect from power supply. The process must then be restarted from the beginning. Help: Fault Display is not lit up. Possible cause The unit is not switched on. The connection to the balance is interrupted Power supply interrupted.