User manual
FFN-N-BA-e-1222    22 
7.2.1  Adjustment switch and seals 
After a verification the balance is sealed at the indicated positions. 
Position of the official seals:  
1.  Verification wire fastening 
2.  Verification wire fastening 
3.  Self-destroying seal mark 
4.  Cover of adjustment switch 
5.  Adjustment switch 
6.  Self-destroying seal mark 










