Installation guide

11
ENGLISH
ESPAÑOL
WALL VENTED INSTALLATION:
1. Remove one blower unit mounting screw and
two blower plate screws. Remove the blower
plate from cabinet. See Figure 12.
2. Carefully lift the blower unit out of the microwave
oven. Disconnect the blower wire from
connector. See Figure 13.
3. Use side cutters or tin snips to cut and remove
knockouts "B" from Back plate. Discard
knockouts. Be careful not to distort the plate.
See Figure 14.
4. Rotate the unit so that the exhaust ports face the
rear of the cabinet. See Figure 15. Before you
insert blower unit, blower wire must be like
Figure 15.
5. Reassemble the blower wire into the connector.
6. Place blower unit back into cabinet. Check that
the exhaust ports face towards the rear of the
cabinet. See Figure 16.
7. Reattach the blower plate to the top of the
cabinet as it was originally assembled. Attach
with one blower unit mounting screw and then
two blower plate mounting screws.
See Figure 17.
8. Go to STEP 4, PREPARE THE WALL AND
UPPER CABINET FOR INSTALLATION
located on page 13.
STEP 3:
PREPARE THE VENTING BLOWER
exhaust
ports
Parts "B"
Knockouts Parts "B"
blower
unit
blower plate
mounting screws
blower plate
blower unit
mounting screw
blower unit
Knockouts "B"
back plate
exhaust
ports
blower plate
mounting
screws
blower unit
mounting screw
blower unit
exhaust ports
blower wire
connector
Figure 12
Figure 13
Figure 14
Figure 15
Figure 16 Figure 17