Product Manual
Tools needed:
Step 1:
Philips head
Screwdriver
or Drill
Crescent Wrench or
3/8” Box Wrench
What’s in the box?
QTY 2: Main Frames
(Idencal frames:
Either can be used as
the top or boom.)
QTY 2: Rails
QTY 25: Rack Screws
Select your boom frame. Place rail on the inside corner
of the frame and align it so the tapped holes face the
front. Secure in place with two acorn nuts.
Step 2:
Screw (or drill) two rack screws into the rail at the boom.
Place the second frame on top and secure with two acorn nuts.
Then secure the rail by installing two rack screws at the top.
QTY 8: Acorn Nuts
Step 3:
When one side is complete with the top frame in place,
slide in the second rail and secure with two acorn nuts.
You may nd it easiest to fasten from boom to top.
Step 4:
Repeat step 2 to screw (or drill) two rack screws into both the
top and boom of the rail.
Rack is now ready to be installed at 16” on center.
When top and boom are in place.


