Product Manual

Tools needed:
What’s in the box:
Step 1 : Assemble the L Bracket Bases to the Vercal Rails
as shown below. Do this for both sides.
9/16” Wrench
QTY 2—Vercal 10-32 Tapped Rails
QTY 2—Upper Support Brackets
QTY 2—L Bracket Bases
Step 2 : Assemble the Upper Support Brackets to the top of
the Vercal Rails as shown below. Do this for both sides.
Grounding Studs: Note that there are 1/4-20 Grounding
Studs on the top and boom of each Vercal Rail. See
placement below.
Boom Locaon
Top Locaon
Rack Screws:
For your convenience, twenty ve
(25) 10-32 rack screws have been
provided to install rackmount
equipment into your new relay
rack. If you should need addional
hardware please contact us, or an
authorized reseller today.
PHONE: 651-213-1233
Email: sales@kendallhoward.com
QTY 16—Tooth Washers
QTY 8—9/16” Hex Nuts
QTY 8—9/16” Hex Bolts