User Manual
KENCO ACCU-RATE PUMP SETTING GAUGE® 
INSTALLATION AND OPERATING INSTRUCTIONS 
Install pipe fittings into gauge by rigidly clamping the END PLATE that is to have piping 
installed. Tighten the pipe fittings into the threaded connection of this END PLATE. 
GLASS SIGHT TUBE will BREAK if the END PLATE is not HELD RIGIDLY to eliminate 
any TWISTING. 
GAUGE MUST BE INSTALLED SO GRAVITY WILL FILL THE GAUGE. 
To check pumping rate, open VALVE “B” to fill the pump setting gauge. When the 
gauge is filled, close VALVE “A” for one minute and note the level in the gauge at the 
beginning of the test and at the end of the test. Count the number of marks on the rate 
scale that the level dropped. This is the pump rate. 
58270 
(12-22-11) 


