Operation Manual
24
A5 TIG Orbital System 75© Kemppi Oy 2016 1615
OPERATING MANUAL
4.2.1 Ordering collets
When ordering collets, it is important to specify the exact
OD dimension of the tube or tting. Because of the wide
range of tting manufacturers, it is necessary to specify
the tting manufacturer and type. If possible, include data
sheet or drawing dening the specication for the tting
in the order.
Each tting manufacturer has dierent tolerances on the
dimensions of the ttings. Several tting manufacturers
have special product lines specically designed for orbital
welding.
Collets for each type of weld head are specied by:
• Weld head model
• Tube/pipe OD
• Flush or extended
The codes in the below list are per pair of collets. One
weld head requires two pairs
4.2.2 Collets
When ordering collets, it is important to specify the exact
OD dimension of the tube or tting. Because of the wide
range of tting manufacturers, it is necessary to specify
the tting manufacturer and type. If possible, include data
sheet or drawing dening the specication for the tting
in the order.
Each tting manufacturer has dierent tolerances on the
dimensions of the ttings. Several tting manufacturers
have special product lines specically designed for orbital
welding.
Collets for each type of weld head are specied by:
• Weld head model
• Tube/pipe OD
• Flush or extended
The ordering codes in the above list are per pair of
collets. One weld head requires two pairs.