Installation Guide

46
92.1% HORIZONTAL RIGHT - 1 PIPE OPTIONS
Plug
VIEW -D-
VIEW -E-
VIEW -F-
VIEW -G-
COMBUSTION
AIR
FLUE PIPE
Rubber
Grommet
OPTION
7
OPTION
8
PVC TEE,
Reducer, &
1/2” x 1/2”
Hose Barb
COMBUSTION
AIR
Rubber
Grommet
See VIEW D for
drain line positions
See VIEW E for
drain line positions
Plug
FLUE PIPE
OPTION
10
FLUE PIPE
Rubber
Grommet
OPTION
9
COMBUSTION
AIR
See VIEW F for
drain line positions
Plug
PVC TEE,
Reducer, &
1/2” x 1/2”
Hose Barb
FLUE PIPE
COMBUSTION
AIR
Plug
See VIEW G for
drain line positions
Plug
Plug
Plug
Plug
Rubber
Grommet
92.1% HORIZONTAL LEFT - 1 PIPE OPTIONS
Drain Line
Attached to
1/2” x 1/2”
Hose Barb
NOTES:
1.) All drain lines must be trapped with J-Trap or field supplied loop.
2.) Inline drain tubing may need to be cut to length to resemble illustration.
3.) See Accessories section (page 21-22) for optional PVC Tee configurations and drainage options.
4.) Header box drain tubing is routed thru the side of the cabinet.
5.) Inline drain tubing is routed thru the side of the cabinet.
Inline
Drain
See NOTE 4
See NOTE 5
See NOTE 4
See NOTE 5
Figure36.HorizontalVentingOptions-1PipeFurnaces(*SCModels)