Installation Guide
50
95.0% UPFLOW - 1 PIPE OPTIONS
95.0% UPFLOW - 2 PIPE OPTIONS
Plug
VIEW -P-
Inline
Drain
VIEW -O-
Plug
OPTION 21
See VIEW O for drain line positions
Rubber
Grommet
OPTION 22
See VIEW P for drain line positions
Rubber
Grommet
OPTION 23
See VIEW O for drain line positions
OPTION 24
See VIEW P for drain line positions
COMBUSTION
AIR
COMBUSTION
AIR
COMBUSTION AIR
COMBUSTION AIR
FLUE PIPE
FLUE PIPE
X
FLUE PIPE
Plug
X
FLUE PIPE
Rubber
Grommet
Rubber
Grommet
PVC Tee
PVC Trap
PVC Tee
PVC Tee
PVC Trap
PVC Tee
PVC Trap
PVC Tee
PVC
Trap
PVC Tee
PVC Trap
PVC
Trap
NOTES:
1.) All drain lines must be trapped with J-Trap or field supplied loop.
2.) Drain line traps may be positioned inside or outside the cabinet.
3.) Inline drain tubing may need to be cut to length to resemble illustration.
4.) See Accessories section (page 21-22) for optional PVC Tee configurations and drainage options.
5.) Header box drain tubing is routed thru the blower deck and side of the cabinet.
6.) Inline drain tubing is routed thru the blower deck and side of the cabinet.
7.)
This drain not needed if “X” is less than 6”.
See
NOTE 5
See
NOTE 5
See NOTES 6 & 7
Figure40.UpowVentingOptions(*SDSeries)