10-year maintenance: Changing the static inverter in the RDU
Inspection sheet
4 of 6
C. Custom Settings
The Inverter parameters must then be changed as follows:
Press the MODE button.
' Whilst programming, the Prog indicator is ON for main function path and Flashing
for F.---setting path.
' Press. buttons to scroll down through the function menu as listed below. Pressing
/ button scrolls up the menu.
' At any function press ENT to read the function setting. Press ./ buttons to change
setting.
' Press ENT to enter new setting and return to function menu.
' When the menu reaches F---, Press ENT to access F100 then . to scroll F101
F102 to F990.
' Pressing / scrolls F100, F990, F880 .. to F100.
' At any F--- function press Ent to read function setting and ./buttons to change
Setting.
' Press Ent to enter the new setting and return to the Function menu.
' To exit menus, press MODE button until 0.0 is displayed.
Custom Settings for TOSHIBA Inverter
FUNCTION DESCRIPTION SET OPERATION
CN0d Command Mode
0 0 p Remote Control
1 - Inverter operation panel
FN0d Frequency Setting Mode
5
0: Internal potentiometer setting
1: VIA
2: VIB
3: Operation panel
4: Serial communication
5: External contact up/down
6: VIA+VIB (Override)
typ
Standard Setting Mode
(Input frequency)
1
0: -
1: 50Hz default setting
2: 60Hz default setting
3: Standard default setting
(Initialization)
4: Trip record clear
5: Cumulative operation time clear
6: Initialization of type information
7: Save user-defined parameters
8: Call user-defined parameters
9: Cumulative fan operation time
record clear