Datasheet

Model 4299-3 Installation Instructions
PA-942 Rev. A / May 2007 5
Step 3. Prepare the rack
1. Install the Cage Nuts (FA-274) into the front rack holes for the Front Rack Ear and the Half Rack Front
Panel (refer to Figure 3).
NOTE Cage nuts for the front rack ear, Half Rack Front Panel should be installed into the rails
at the same hole spacing (vertical height).
Figure 3
Front Rack Rails
Cage Nut
FA-274
(4 Places)
Step 4. Install the instrument
NOTE When rack mounting restricts access to the main power cord, provide a separate main
power disconnect device. This device must be located in close proximity to the
equipment and within easy reach of the operator.
1. While still supporting the unit, secure it to the front of the rack with four Truss Head Screws
(10-32x5/8PHTRSH).