User manual
OPERATION
75
Test Sequence Settings
Test sequence
Run
Runs the chosen test sequence from the internal
memory. A test sequence must first be loaded
into the internal memory before it can be run.
See the Utility function “Test Sequence Load”,
below.
The test sequence will run as soon as the utility
function is started.
T-01
1~10
Test sequence
Load
Loads a test sequence from the USB drive to the
designated save slot in memory. A test
sequence must first be loaded into internal
memory before it can be run.
T-02
1~10 (USB2260B)
Test Export
Exports a test sequence from the designated
memory save slot to the USB drive.
T-03
1~10 (2260BUSB)
Test sequence
Remove
Deletes the chosen test sequence file from the
2260B internal memory.
T-04
1~10